Building Hoist SC250 Construction Equipment

Loading Port:China main port

Payment Terms:TT or LC

Min Order Qty:1 unit

Supply Capability:30 unit/month

Product Description:


Structure of SC250 Building Hoist Description

        

Payload(kg):2500                                          

Lifting Speed(m/min):0~60                        

Motor Power(kw): 3*18.5

Safety Device: SAJ50-1.4                            

Cage: Single                                                

Counterweight: No

Certification: CE,ISO                                      

Place of Origin: China(Mainland)              

Model Number: Type:SC250


Packaging & Delivery of SC250 Building Hoist 


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Parts of SC250 Building Hoist 


● Adopts the most advanced VF speed control device and microcomputer programmable logic controller.


● Stepless speed control helps eliminate the concussion during start up and braking, steady the operation process,

and ensures automated leveling.


● The steadiness during running mitigates concussion to mechanical parts, reduces wears of rack, pinion and the brake

and prolongs the spare parts'life.   


● The VF system also has the over voltage protection,low voltage protection, overcurrent, overload and anti-stalling     protection functions,


● The system applies the special software for hoists developed by our company, making the operation more safe and 

reliable.


SC250 Building Hoist Images


CMAX Building Hoist

Building Hoist SC250 Construction Equipment

Anchorage System

Building Hoist SC250 Construction Equipment

Mast Section

Building Hoist SC250 Construction Equipment

Driving Unit

Building Hoist SC250 Construction Equipment


SC250 Building Hoist Specifiction


Building Hoist SC250 Construction Equipment


FAQ of SC250 Building Hoist


Q: What is the building hoist main purpose? 

A: Building hoist equipped with double or single cabin to transport the materials and labors up and down. It's the ideal 

construction equipment for vertical transportation in the field of construction.  

  

Q: What is the meaning of the building hoist’s code?

 A: Take SC200/200 for example: “SC” stands for rack and pinion hoist, “200/200” stands for double cage and capacity 

is 2 tons per cage. “SC200” stands for single cage and capacity is 2 tons. 

 

Q: What is the dimension of the cage? 

A: Normally the cage dimension is 3X1.5X2.5M (L/W/H) for 2t type hoist. Details should be checked according to our 

quotation sheet. Also, the size can be customized according to the factual site condition.  There are two doors (entrance

 & exit doors) for each cage, It can be produced as up & down sliding or ramping model for safety and convenience.